Water Main WO (1)
| <all other values> |
| Improve Main |
| Repair Main Break |
| Repair Main Leak |
| Tap Main |
| Unidirectional Flushing |
Hydrant WO (2)
| <all other values> |
| Chlorine Sample |
| Flushing Hydrant (Round 1) |
| Flushing Hydrant (Round 2) |
| Hydrant Painting |
| New Hydrant |
| Remove Hydrant |
| Repair Hydrant |
| Replace Hydrant |
| Requested Hydrant Flushing |
Valve WO (3)
| <all other values> |
| Flushing Valve (Round 1) |
| Flushing Valve (Round 2) |
| Locate Valve |
| New Blow-Off |
| New Valve |
| Repair Blow-Off |
| Repair Valve |
| Repair Valve Box |
| Replace Blow-Off |
| Replace Valve |
| Replace Valve Box |
| Requested Valve Flushing |
| SMP Sample |
| Unidirectional Valve Prep |
Service Line WO (4)
| <all other values> |
| Abandon Service Line |
| Install Service Line |
| Repair Service Line |
| Replace Lead Service Line |
| Replace Service Line |
| Transfer Service Line |
| Transfer and Replace Lead Service Line |
Shut Off WO (5)
| <all other values> |
| Backflow Building Survey |
| Change Out Meter |
| Check for Leaks |
| ECR Repair |
| Get New Meter Information (Customer Replaced) |
| Install Meter |
| Install Meter Lid Riser |
| Install Riser on Vault |
| Install Touch Read or MXU |
| Noncompliance Notice |
| Pulled Meter |
| Repair Curb Box |
| Repair Curb Stop |
| Repair Meter Vault |
| Replace Curb Box |
| Replace Curb Stop |
| Replace Meter Vault |
| TRPL Repair |
| Tap and Curb Stop / Box |
| Tap and Meter Vault |
| Touch Pad Damaged |
| Turn Water On or Off |
Service Point WO (6)
| <all other values> |
| Backflow Building Survey |
| Change Out Meter |
| Check for Leaks |
| ECR Repair |
| Get New Meter Information (Customer Replaced) |
| Install Meter |
| Install Meter Lid Riser |
| Install Riser on Vault |
| Install Touch Read or MXU |
| Noncompliance Notice |
| Pulled Meter |
| Repair Curb Box |
| Repair Curb Stop |
| Repair Meter Vault |
| Replace Curb Box |
| Replace Curb Stop |
| Replace Meter Vault |
| TRPL Repair |
| Tap and Curb Stop / Box |
| Tap and Meter Vault |
| Touch Pad Damaged |
| Turn Water On or Off |
Backflow Customer WO (7)
| <all other values> |
| Add Backflow |
| Backflow Inspections |
| New Backflow Customer |
| Remove Backflow |
Structure WO (8)
| <all other values> |
| Booster Station Maintenance |
| Regulation Pit Maintenance |
| SMP Sample |
| Stand Pipe Inspection |
Lead Service Replaced WO (9)
| Replace Lead Service Line |
Restoration WO (10)
| <all other values> |
| Road Repair |
| Tree Lawn |
| Tree lawn and Road Repair |
Water Main INSP (12)
| <all other values> |
| Water Main Break Inps |
Hydrant INSP (13)
| <all other values> |
| Hydrant Operated Insp |
Valve INSP (14)
| <all other values> |
| Valve Operated Insp |
Shut Off INSP (15)
| <all other values> |
| Backflow Inspection |
| Elevated Tank Insp |
| Fireline Backflow Inspection |
| Ground Reservoir Insp |
| Hydrant Operated Insp |
| Inital Backflow Fireline |
| Initial Backflow-Inside Meter |
| Initial Backflow-Outside Meter |
| Retrofit Backflow Inspection |
| Valve Operated Insp |
| Water Main Break Inps |
Service Point INSP (16)
| <all other values> |
| Backflow Inspection |
| Elevated Tank Insp |
| Fireline Backflow Inspection |
| Ground Reservoir Insp |
| Hydrant Operated Insp |
| Inital Backflow Fireline |
| Initial Backflow-Inside Meter |
| Initial Backflow-Outside Meter |
| Retrofit Backflow Inspection |
| Valve Operated Insp |
| Water Main Break Inps |
Backflow Customer INSP (17)
| <all other values> |
| Backflow Inspection |
| Fireline Backflow Inspection |
| Inital Backflow Fireline |
| Initial Backflow-Inside Meter |
| Initial Backflow-Outside Meter |
| Retrofit Backflow Inspection |
Structure INSP (18)
| <all other values> |
| Elevated Tank Insp |
| Ground Reservoir Insp |
Water Service Requests (19)
| <all other values> |
| Assets not on GIS |
| Blow Off Needs Repaired |
| Hydrant Needs Repaired |
| Repair Hydrant Lead Valve |
| Unknown Blow Off Location |
| Unknown Valve Location |
| Valve Needs Repaired |
Manholes WO (21)
| <all other values> |
| Flood Control |
| Manhole Repair |
Gravity Mains WO (22)
| <all other values> |
| Flush Manhole - Trouble Spot |
| Gravity Main Repair |
| Grease - Trouble Spot |
| Grease Removal |
| Inflow and Infiltration Investigation |
| Jetting Main |
| Roots - Trouble Spot |
| Sagging Line - Trouble Spot |
| Televising Main |
Force Mains WO (23)
| <all other values> |
| Force Main Repair |
Structure WO (24)
| <all other values> |
| Flood Control |
| Grinder Pump Investigation |
| Grinder Pump Maintenance |
| Grinder Pump Repair |
| Lift Station Investigation |
| Lift Station Maintenance |
| Lift Station Repair |
| Sludge Tanking |
| Treatment Plant Maintenance |
| Treatment Plant Repair |
Gravity Main INSP (26)
| <all other values> |
| Grease Insp |
| Jetting Insp |
| Mineral Insp |
| Root Insp |
Sanitary Service Requests (27)
| <all other values> |
| Grinder Pump |
| Gurgling |
| Manhole Cover Missing |
| Manhole Cover Off |
| Other |
| Possible Sewer Back Up |
| SInk Hole |
| Sewer Odor |
| Slow Drain |
| Storage Tank |
|